We are renovating cabins 35 through 40 currently, 31 through 34 having been done previously. In some cases, the renovation entails fixes and partial replacements of floors and walls. In the case of cabin 38, which really needed a complete rebuild, the floor, walls, structures etc. all had to be rebuilt with new materials. These photos are taken of cabin 38 on Saturday. All of these cabins will be finished by the summer—and some of them sooner. The photo at bottom shows the counselor's room.